Construction Association Of Nova Scotia
  • About CANS
    • Vision & Values
    • CANS Board of Directors
    • Your CANS Team
    • CANS Job Postings
    • Member Directory
    • Member Map
    • Member Services Agreement
    • Subscribe & Unsubscribe
    • FAQ
    • Contact Us
  • Substantial Performance
    • Background Information
    • Substantialperformance.com
      • How To Guide
  • Projects/Documents
    • Projects
    • Printing Services
    • Order Documents
    • Reference Material
    • CANSnet Project Previews
  • Events
    • Event Listings
    • Construction Job Fair
    • De-Icer
    • Spring Fling
    • Golf Tournament
    • Annual General Meeting
    • Women in Construction Forum
    • CANS Awards Gala
    • CANS Member Mixers
    • Advertising
    • Sponsorship
    • Photos
  • News
    • Newsletters
    • Press Releases & News
    • Advocacy
    • Canada-U.S. Tariff Info Centre
  • Member Services
    • Why Join CANS?
    • Membership Fees
    • CANS Emerging Leaders
    • CANS Member Resource Toolbox
    • CANS Member Mixers
    • New CANS Members
    • CANS Awards Program
      • CANS Awards – Call for Nominations
    • Immigration Recruitment Services
  • Education & Training
    • Register for Education Courses
    • Corporate Private Training
    • Gold Seal Certification
    • CANS Workforce Development
    • Building Code Training
  • Building Futures
    • CANS Role in Building Futures
    • Buildingfutures.ca
    • Become a Host Employer
  • Affiliates
    • Online Bidding
    • Substantialcompletion.com
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu

Follow CANS Pipeline: Marconi Campus Relocation Project

NSCC – Marconi Campus Relocation Project

About the project:

The vision of the Marconi Campus Relocation projects is to create a campus with a dynamic learning environment that will attract students from across the province. It will have a modern design, open spaces and state-of-the-art technology and contribute to the revitalization of the downtown.

The new campus, to be built on the Sydney waterfront, is expected to open in September 2024. The facility will be designed and built in accordance with accessibility standards and guidelines following the Rick Hansen Foundation Accessibility Certification Program and Leadership in Energy and Environmental Design (LEED) standards, one of the most widely used green building certification programs in the world.

On November 21, 2019, NSCC awarded the contracts for architectural design and engineering services to Barrie & Langille Architects Ltd. and Moriyama & Teshima Architects, along with Fathom Studio (formerly Ekistics Planning & Design) and other sub-consultants.

We have been following this project! Have you?

See our Pipeline connection PL19-0336NS about the NSCC Marconi Campus Relocation (Sydney, NS) for more information, or click the associated trade packages for open tenders.

(Note: you must be signed into your CANSnet account in order to access information from the Pipeline, Open Tenders and/or Results and Awards).

Related Projects:
  • NS21-1251 – NSCC Sydney Waterfront Campus Development – 22.2 Mechanical Building B&C
  • NS21-1252 – NSCC Sydney Waterfront Campus Development – 26.2 Electrical Building B&C
  • NS19-1664 – NSCC – RFP – Professional Architectural and Engineering Services For Construction of The New Marconi Campus, Sydney NS
  • NS19-1750 – NSCC – RFP – Construction Management Services, NSCC New Marconi Campus, Sydney NS
  • NS20-1099 – NSCC – Sydney Waterfront Campus Development – Clearing and Grubbing
  • NS20-1194 – NSCC – Supply Three (3) New WhisperRooms to the NSCC Marconi Campus- c/o The Convent, 170 George Street, Sydney, NS
  • NS20-1295 – NSCC – Sydney Waterfront Campus Development – Tender Package 31.2 – Piling

Project News

Read more about this project from coverage in the news—

  • SaltWire Network – “Tenders issued for new NSCC Sydney Campus” (September 15, 2020)
  • CBC – “Work set to begin this month on new NSCC Marconi Campus in Sydney” (July 11, 2020)
  • Chronicle Herald – “Construction to begin this month on new Nova Scotia Community College on Sydney waterfront” (July 10, 2020)

Project Documents

Looking for the Tender Documents?

Full-size drawings or specs can be ordered directly from the website, for more assistance, contact CANS.

Looking for Assistance?

Contact a CANS Member Specialist today.
Get in touch via email or call, (902) 468-2267.

CANS Burnside Office

134 Eileen Stubbs Ave, Unit 103
Dartmouth, NS B3B 0A9

Newsletter

Name/Title*
Email*
©2026 Construction Association Of Nova Scotia
  • Home
  • FTP Site
  • Contact Us
  • Substantialperformance.com
Link to: CANS Industry Trend Session – Smarter Spaces Presents “Planning to Re-Open?” Link to: CANS Industry Trend Session – Smarter Spaces Presents “Planning to Re-Open?” CANS Industry Trend Session – Smarter Spaces Presents “Planning to ... Link to: CANS Developing Executives Committee – Call for Applications Link to: CANS Developing Executives Committee – Call for Applications CANS Developing Executives Committee – Call for Applications
Scroll to top Scroll to top Scroll to top